An equipment manufacturer for next generation display technology needed to complete their system development on an expedited timeframe to support their business development goals.
Large substrate (1.5 m x 1.8 m, Gen 6); very tight requirements for particulates and contamination; 16 week lead-time.
Inert gas chamber environment required gas flow design and isolation valves
Module incorporated stacked chambers for reduced footprint